THE RIGHT EQUIPMENT. THE RIGHT ROUTE. EVERY STEP PLANNED IN ADVANCE.
Project logistics begins long before the cargo starts moving. If dimensions, weight, center of gravity, loading and delivery sites, routing, permits, lifting and securing requirements are not evaluated together, one small detail can affect the entire operation.
At Sdt Global Logistics, we develop tailored transportation plans for heavy, out-of-gauge cargo and shipments that cannot be moved using standard equipment. Working with specialist carriers and solution partners, we combine road, ocean and air freight whenever necessary to create safe, feasible and cost-effective solutions.
From feasibility studies and route surveys to equipment selection, loading, securing, port and terminal handling, transit and final delivery, we coordinate every stage of the operation through a single point of contact. Timelines, responsibilities, potential risks and contingency plans are established in advance.
OUR CAPABILITIES
• Project feasibility, route surveys and operational planning
• Heavy, oversized and out-of-gauge cargo transportation
• Multimodal solutions combining road, ocean and air freight
• Special equipment including lowbeds, extendable trailers, platforms, Mafi trailers, Open Top containers and Flat Racks
• Vessel and aircraft charter or part-charter arrangements
• Loading, unloading, lifting, lashing and securing coordination
• Route surveys, road permits and escort arrangements when required
• Coordination of customs, transit, port and terminal processes
• Transportation from factories, project sites or ports to the final destination
• Operational tracking, timely updates and status reporting
THE CARGO MAY BE NON-STANDARD. THE PROCESS ISN’T.
In project logistics, a minor error can affect the entire transportation chain. We therefore clarify the critical details before the cargo moves, assess potential risks and keep alternative solutions ready. Once the operation begins, we ensure that every party works with the same information, monitor developments closely and act quickly whenever necessary.
Because successful project logistics is never improvised. It is planned.